Lightweight solar panels receive high marks in early testing at Carnarvon Depot

In a series of firsts, we recently completed the installation and testing of lightweight solar panels on our Carnarvon Depot.  

In a series of firsts, we recently completed the installation and testing of lightweight solar panels on our Carnarvon Depot.  

The Carnarvon Depot Lightweight Solar Panel Project supports the uptake of behind-the-meter (BTM) commercial solar and facilitates the investigation of emerging energy technologies. 

The project was engineered to create a controlled test between:  

  • Traditional glass modules (500 W), using established technology with known durability and efficiency; and  
  • 520 W lightweight modules, incorporating frameless, glass-free construction offering significant weight reduction, easy handling and potential applications where roof loading is restricted.  

Andrea Thomas, Customer Programs Manager, said it’s exciting to see Horizon Power explore the potential of this new technology. 

“These lightweight panels open new opportunities for renewable deployment and valuable insights into whether the advantages come with trade-offs. So far, initial feedback is that the panels are extremely lightweight, flexible and durable.”

OLD ImageTileBlock - Replace with Media Split Block

Both systems are now live with the project team set to log and analyse key data sets in the coming months, including energy yield, inverter efficiency, temperature performance, degradation rates and any differences in installation/maintenance requirements.  

Reflecting on how this program supports our Corporate Strategy and our Customer Energy Resources (CER) uptake goal to deliver 300MW of coordinated CER by 2030, Andrea said, “this project helps us demonstrate leadership in renewable energy uptake as well as trial new technology that may remove barriers our customers face, like roof strength, cyclone-zone regulations, vandalism, and high freight costs”.  

Renewable power secures energy future for Blackstone community

A new hybrid renewable energy project jointly funded by the State and Fderal governments will deliver safer, more reliable and cleaner energy to the remote Western Australian community of Blackstone (Papulankutja).

Read more

Carbon capture trial supports decarbonisation of diesel generators

We’ve recently completed a pioneering trial to test the application of carbon capture, usage and storage (CCUS) technology to decarbonise diesel generators.

Read more

Horizon Power acknowledges the Traditional Custodians throughout Western Australia and their continuing connection to the land, waters and community. We pay our respects to all members of the Aboriginal communities and their cultures; and to Elders past, present and emerging.

Aboriginal and Torres Strait Islander people are advised that this website may contain images, names or voices of deceased people.