N2 Government entities
The N2 electricity tariff is for State, Commonwealth and Foreign Government entities that are supplied energy from a service area outside the North West Interconnected System (NWIS).
This tariff is for State, Commonwealth and Foreign Government entities that are supplied from a regional non-interconnected system (NIS), in rural and remote areas across the Kimberley, Gascoyne Mid-West, Goldfields Esperance regions and the Pilbara towns of Marble Bar, Nullagine and Onslow.
Horizon Power customers within these areas pay the same price for their electricity, according to the tariff appropriate for their type of business.
| Regional Non-Interconnected Systems | Supply charge per day | Variable charge cents/kWh |
| N2 | $7.1033 /day | 61.0593 cents/kWh |
| N2-Band 1 (160-250 MWh) |
$290.8950 /day | 16.5845 cents/kWh |
| N2-Band 2 (250-300 MWh) |
$387.5600 /day | 16.5845 cents/kWh |
| N2-Band 3 (300-400 MWh) |
$484.8250 /day | 16.5845 cents/kWh |
| N2-Band 4 (400-700 MWh) |
$758.7050 /day | 16.5845 cents/kWh |
| N2-Band 5 (700-1000 MWh) |
$1,168.1105 /day | 16.5845 cents/kWh |
| N2-Band 6 (1000-2000 MWh) |
$2,058.3640 /day | 16.5845 cents/kWh |
| N2-Band 7 (2000-4000 MWh) |
$3,657.4255 /day | 16.5845 cents/kWh |
| N2-Band 8 (Above 4000 MWh) |
$5,670.4333 /day | 16.5845 cents/kWh |
Billing
|
Description |
Fee |
|
Account establishment |
$26.55 |
|
Copy of customer invoice request |
No fee |
|
Card transaction fee |
0.34% |
|
Dishonour fee (via Australia Post) |
$30.42 |
|
Dishonour fee (via direct debit) |
$2.76 |
|
Overdue account notices |
$6.42* |
|
Over the counter payment (Australia Post) |
$2.81 |
|
Paper bill fee |
$1.32 |
| *GST not applicable
|
|
Metering
| Description | Fee |
| Adding or removing meters from an embedded network account | Quote required |
| Embedded network management | $345.00 |
| Interval data request | $31.57 |
| Manual meter read - manual | $168.00 |
| Manual meter read - special | $25.28 |
| Meter test - standard meter testing | $274.00 |
| Meter test - concession rate | $171.00 |
| Meter damage | $942.00 |
| Rebilling of an embedded network master meter account | Quote required |
| Reconciliation of embedded network master account | Quote required |
| Remote meter configuration | $29.10 |
| Remote reconnection or disconnection | $6.87 |
| Subsidiary electricity meter rental (daily charge) | $0.1790 |
Effective 1 July 2025 and include GST unless otherwise stated. The variable electricity rate is charged per 'unit' - this is one kilowatt-hour (kWh).
The pricing details shown relate to Horizon Power customers connected to regional non-interconnected system (NIS), in rural and remote areas across the Kimberley, Gascoyne Mid-West, Goldfields Esperance regions and the Pilbara towns of Marble Bar, Nullagine and Onslow. For areas connected to the South West Interconnected System (SWIS) please contact Synergy.
Horizon Power acknowledges the Traditional Custodians throughout Western Australia and their continuing connection to the land, waters and community. We pay our respects to all members of the Aboriginal communities and their cultures; and to Elders past, present and emerging.
Aboriginal and Torres Strait Islander people are advised that this website may contain images, names or voices of deceased people.