N2 Government entities

The N2 electricity tariff is for State, Commonwealth and Foreign Government entities that are supplied energy from a service area outside the North West Interconnected System (NWIS).

This tariff is for State, Commonwealth and Foreign Government entities that are supplied from a regional non-interconnected system (NIS), in rural and remote areas across the Kimberley, Gascoyne Mid-West, Goldfields Esperance regions and the Pilbara towns of Marble Bar, Nullagine and Onslow.  

Horizon Power customers within these areas pay the same price for their electricity, according to the tariff appropriate for their type of business. 

OLD IconSectionBlock - Replace with Icon Container Block
Regional Non-Interconnected Systems Supply charge per day Variable charge cents/kWh
N2 $7.1033 /day 61.0593 cents/kWh
N2-Band 1
(160-250 MWh)
$290.8950 /day 16.5845 cents/kWh
N2-Band 2
(250-300 MWh)
$387.5600 /day 16.5845 cents/kWh
N2-Band 3
(300-400 MWh)
$484.8250 /day 16.5845 cents/kWh
N2-Band 4
(400-700 MWh)
$758.7050 /day 16.5845 cents/kWh
N2-Band 5
(700-1000 MWh)
$1,168.1105 /day 16.5845 cents/kWh
N2-Band 6
(1000-2000 MWh)
$2,058.3640 /day 16.5845 cents/kWh
N2-Band 7
(2000-4000 MWh)
$3,657.4255 /day 16.5845 cents/kWh
N2-Band 8
(Above 4000 MWh)
$5,670.4333 /day 16.5845 cents/kWh
OLD IconSectionBlock - Replace with Icon Container Block
collapse icon

Billing

Description

Fee

Account establishment

$26.55

Copy of customer invoice request

No fee

Card transaction fee

0.34%

Dishonour fee (via Australia Post)

$30.42

Dishonour fee (via direct debit)

$2.76

Overdue account notices

$6.42*

Over the counter payment (Australia Post)

$2.81

Paper bill fee

$1.32

*GST not applicable

 

 

Metering

Description Fee
Adding or removing meters from an embedded network account Quote required
Embedded network management $345.00
Interval data request $31.57
Manual meter read - manual $168.00
Manual meter read - special $25.28
Meter test - standard meter testing $274.00
Meter test - concession rate $171.00
Meter damage $942.00
Rebilling of an embedded network master meter account Quote required
Reconciliation of embedded network master account Quote required
Remote meter configuration $29.10
Remote reconnection or disconnection $6.87
Subsidiary electricity meter rental (daily charge) $0.1790

 

collapse icon

Effective 1 July 2025 and include GST unless otherwise stated. The variable electricity rate is charged per 'unit' - this is one kilowatt-hour (kWh).

The pricing details shown relate to Horizon Power customers connected to regional non-interconnected system (NIS), in rural and remote areas across the Kimberley, Gascoyne Mid-West, Goldfields Esperance regions and the Pilbara towns of Marble Bar, Nullagine and Onslow. For areas connected to the South West Interconnected System (SWIS) please contact Synergy.

OLD IconSectionBlock - Replace with Icon Container Block

The future of energy is evolving fast

We're working with the State Government, Synergy and Western Power to transition how we produce, manage and consume energy in WA.

Horizon Power acknowledges the Traditional Custodians throughout Western Australia and their continuing connection to the land, waters and community. We pay our respects to all members of the Aboriginal communities and their cultures; and to Elders past, present and emerging.

Aboriginal and Torres Strait Islander people are advised that this website may contain images, names or voices of deceased people.