Apply to connect an EV charger

If you’re connecting an EV charger we need to know about it. Having visibility of EV charger connections helps us plan and maintain network stability. Depending on the size of the EV charger - our engineers may need to assess your connection request and notify you of the outcome as soon as possible.
If you’re connecting an EV charger we need to know about it. Having visibility of EV charger connections helps us plan and maintain network stability.

Depending on the size of the EV charger, once you’ve submitted an application - our engineers will assess your connection request and notify you of the outcome as soon as possible.

Let's begin

* All fields are required unless indicated as optional.

Ready to apply to connect?

This form should take less than 5 minutes to complete. Don't forget to have the following details handy to complete this application:
  • Details of the EV charger/s
  • The account number and meter number of the installation address
  • The relevant EVSE Technical Requirements to connect
If you're installing EV chargers at more than one location you will need to submit one application per location.
This connection request is for a… *
Will this EV Charger be used to export energy back into the electrical network or customer’s electrical installation? *

Chargers configured for Vehicle to Grid or Vehicle to Building export functionality will also need to complete a separate renewable energy system application form

EV Charger details

EV Charger details

Is the EV charger phase... *
Will a ramp rate control system be installed with this charger at installation? *

A ramp rate control system is required for level 3 chargers to smooth out power fluctuations (except for those connecting to the Pilbara network) - to maintain network stability.
How many of these charger types will be installed?
1 20
Add another charger type

EV charger 2 details

Is the EV charger phase... *
Will a ramp rate control system be installed with this charger at installation? *

A ramp rate control system is required for level 3 chargers to smooth out power fluctuations (except for those connecting to the Pilbara network) - to maintain network stability.
How many of these charger types will be installed?
1 20

EV charger 3 details

Is the EV charger phase... *
Will a ramp rate control system be installed with this charger at installation? *

A ramp rate control system is required for level 3 chargers to smooth out power fluctuations (except for those connecting to the Pilbara network) - to maintain network stability.
How many of these charger types will be installed?
1 20

Please attach the following schedule to the application

System diagram  - a single line diagram that illustrates the connection of the proposed EV charger to the customers installation.


> Download sample diagram

Installation details

Installation details

Is the customer connected to a stand-alone power system (SPS)? *

Connection capacity

Electrical contractors must complete a connection capacity assessment by assessing the expected load demand of the customer’s electrical installation. Please refer to the EVSE Technical Requirements for more information.
Has a connection capacity assessment been completed? *
Is a load upgrade required for this connection? *

Customer details

Is the EV charger connection for a...

Installer details

Electrical contractor details

Please refer to Horizon Power’s EVSE Technical Requirements and agree to the following:

Horizon Power acknowledges the Traditional Custodians throughout Western Australia and their continuing connection to the land, waters and community. We pay our respects to all members of the Aboriginal communities and their cultures; and to Elders past, present and emerging.

Aboriginal and Torres Strait Islander people are advised that this website may contain images, names or voices of deceased people.